Client: City of Tipton
This project involves the replacement and upgrade of the HVAC and associated systems for the municipal pool in Tipton, Iowa. The design aspects include determination of the required modifications to the existing air handling equipment and design of the new HVAC ductwork. Purchase and install specifications were created for the new HVAC equipment, ductwork, and accessories, including demolition and installation drawings. Structural and architectural components were also designed into the bid package as part of the plan for comprehensive improvements.
